3
Sep
Construction of the Beachfield Upstream Development (BUD) Pipeline
The 36-inch-diameter BUD marine line was constructed in 2004. It served as the…..
The 36-inch-diameter BUD marine line was constructed in 2004. It served as the catalyst for NGC to deepen and expand its operations at Beachfield. The capacity of NGC’s pipeline system increased from 1.4Bcf to 2Bcf in anticipation of higher demands by new gas-based customers.